Schedule
From concept to keys
The milestones that matter. Construction dates are confirmed once a contractor is selected.
Pre-Renovation
Apr – May
Concept design
Layouts and materiality.
Jun – Aug
Schematic design
Final presentation accepted.
Now
Design development
Schedules and construction drawings.
After DD
Bidding and contractor selection
Every bid compared line by line.
During Renovation
Set with the contractor
Construction
Weekly reports and site inspections.
Post-Renovation
At completion
Final inspection and handover
Warranties, manuals and maintenance guides.